top of page
9-1_edited.jpg

Contaminated Sediment Control

Our bottom-sealing filter barriers will contain sediments or contaminants in tidal waters with water level fluctuations. These systems can even be utilized in areas of high current velocities, bi- or multi-directional currents, substantial tidal height fluctuations, and vessel traffic such as the projects below.

Contact us today to learn more about how we can provide a custom solution for your project.

IMG_1245.JPG

Fore River Remediation

Shoreline remediation project that utilized a turbidity containment and fish exclsuion barrier as an alternative to a temporary sheet pile cofferdam.

egdphototofix.jpg

Esquimalt Graving Dock Remediation

Project required several filter barrier curtains installed around jetty perimeter and dredging areas to contain re-suspended sediment.

Picture1.png

Pemart Avenue MGP

Remediation of a former manufactured gas plant at Pemart Avenue and removing contaminated sediments in the Hudson River. 

dsc03012_orig.jpeg

Lower Rouge River Old Channel Remediation

Remediation project in Detroit, MI to remove Polycylic Aromatic Hydrocarbons (PAHs) impacted sediment.

Water Intake Protection Barrier (WIPB) to be used during dredge operations.

bottom of page