top of page
(207) 503-3030
CONTAMINATED SEDIMENT CONTROL
2015-2016
Engineering and Design Challenges:
-
Loading on System
-
Large enclosed tidal volume
-
Smaller available geotextile filter area, especially at mid to low tide
-
-
Achieving Adequate Filtration
-
High flux rates (flow per unit area)
-
-
Transitions:
-
Interface of TRB with SPW top
-
Connections between full-depth barrier and SPW section
-
-
Barge Gate Design and Operation
Solutions:
-
Robust anchoring elements
-
Custom filter composite
-
Durable transition interfaces
-
Innovative access features
Outcome:
-
Compliance achieved – monitored daily at six water quality testing locations
-
Design aspects adjusted and addressed during installation and commissioning period due to quick/shorter design period
bottom of page